Sample Snagging Survey Report, Liverpool

Customer Case Study & Sample Snagging Survey Report, 93 Kevins Drive, Kirby, Liverpool

Tuesday, 22 September 2020

“Very thorough and professional, would recommend and certainly work with again.”

T Jones, Google Reviews

The Report

LOCATION 1 93 ST KEVIN’S DRIVE KIRKBY L32 1BB

Assigned to Identification

The overall finish of the house is poor with little attention to detail, in particular, the decoration throughout is a poor standard and gives the house the feeling that it was rushed to completion. The extractor ducts and boiler flue require cavity trays installing to comply with NHBC Standards Chapter 6.1.17

LOCATION 2 FRONT ELEVATION

Assigned To Landscaper

The front bed needs planting.

LOCATION 3 FRONT ELEVATION

Assigned To Joiner

The front door cill needs an end cap fitting.

LOCATION 4 FRONT ELEVATION

Assigned To Groundworker

The gap both sides of the front door needs filling with limestone chippings.

LOCATION 5 FRONT ELEVATION

Assigned to Bricklayer

The timber needs removing from over the front door lintel.

View full report

Click here

Snagging Report
Tuesday, 22 September 2020
95 Issues Identified

Get Your Free Quote:

3 + 11 =

Get Your Free Ultimate Snagging Checklist

Use this easy-to-follow checklist to check your new build home for common defects