Sample Snagging Survey Report, North Yorkshire
Customer Case Study & Sample Snagging Survey Report
Thursday, 8 October 2020
“Very thorough and professional, would recommend and certainly work with again.”
The Report

LOCATION 1
Assigned to IdentificationThe house has been finished to a reasonable standard throughout, more attention to detail would have reduced the number of issues highlighted within the report. Notes – The optional extras that are not as requested by the
customer are:
1/ external electric socket should be behind the gate
2/ shower in the main bathroom should be thermostatic
not electric
3/ outside tap should be off from the. Utility

LOCATION 2 FRONT ELEVATION
Assigned To Plastic Surgeon
The lounge artstone cill is damaged and needs repairing or replacing.

LOCATION 3 FRONT ELEVATION
Assigned To Plastic Surgeon
The left hand bedroom artstone cill is damaged and needs repairing or replacing.

LOCATION 4 FRONT ELEVATION
Assigned To Bricklayer
The en-suite extractor vent needs a cavity tray installed above it to comply with NHBC Standards Chapter 6.1.17. Premier Guarantee Standards 6.1.11.
View full report
Click here
Snagging Report
Thursday, 8 October 2020
70 Issues Identified