Sample Snagging Survey Report, North Yorkshire

Customer Case Study & Sample Snagging Survey Report

Thursday, 8 October 2020

“Very thorough and professional, would recommend and certainly work with again.”

T Jones, Google Reviews

The Report

LOCATION 1 

Assigned to IdentificationThe house has been finished to a reasonable standard throughout, more attention to detail would have reduced the number of issues highlighted within the report. Notes – The optional extras that are not as requested by the
customer are:
1/ external electric socket should be behind the gate
2/ shower in the main bathroom should be thermostatic
not electric
3/ outside tap should be off from the. Utility

LOCATION 2 FRONT ELEVATION

Assigned To Plastic Surgeon

The lounge artstone cill is damaged and needs repairing or replacing.

LOCATION 3 FRONT ELEVATION

Assigned To Plastic Surgeon

The left hand bedroom artstone cill is damaged and needs repairing or replacing.

LOCATION 4 FRONT ELEVATION

Assigned To Bricklayer

The en-suite extractor vent needs a cavity tray installed above it to comply with NHBC Standards Chapter 6.1.17. Premier Guarantee Standards 6.1.11.

View full report


Click here

Snagging Report
Thursday, 8 October 2020
70 Issues Identified

Get Your Free Quote:

14 + 8 =

Get Your Free Ultimate Snagging Checklist

Use this easy-to-follow checklist to check your new build home for common defects